A.D.S were engaged to deliver a methodical & cost-effective Temporary Works Design Solution on multiple structures packages on this $4.3 billion Motorway. This included Formwork, Falsework, maximization of Concrete Pour Rates, and 3rd Party design review of Precast Installation methodologies.